Drake Companies Drake Companies
Drake Companies
  • About
    • Our Story
    • Leadership
    • Safety
  • Construction
    Drake General Contractors
    General Contracting
    Water & Wastewater Treatment
    Site Work
    Paving
    Commercial Paving
    Residential Paving
    Seal Coating
    Striping
    Road & Bridge
    Hwy, Streets & Bridge Construction
  • C-Rae Materials
    • C-Rae Aggregate
    • C-Rae Asphalt
  • Logistics
    • Drake Logistics
  • Drake Companies
  • Projects
  • Careers
  • Subcontractors
    • Bidding Calendar
    • Forms & Documents
  • Contact
    • Contact Us
    • Locations

Paris Wastewater Treatment Plant

Projects Water & Wastewater Treatment Paris Wastewater Treatment Plant

Paris Wastewater Treatment Plant

Phase 2 Project Overview 

The Paris Wastewater Treatment Plant Improvements project delivers an upgrade to the city’s wastewater system, with ma jor work occurring at both the FEB site and the main treatment plant. At the FEB site, the project modernizes preliminary treatment through improvements at the screening chamber and new headwork and influent pumping facilities, large diameter yard piping, and new concrete structures that sup port improved flow handling. 

At the main WWTP site, the project expands solids manage ment capacity, upgrades key treatment processes, and replac es aging facilities with new, more efficient infrastructure. Work includes new structures including an Admin building and Sludge Holding Tanks, new process equipment installations, and targeted rehabilitation of existing treatment structures to extend their service life. 

Together, these upgrades improve flow handling, solids treat ment, and overall plant performance, ensuring the City of Paris is ready for future needs

Scope of Work 

PROJECT FACTS 

Contract Amount: $40m
Owner: City of Paris
Engineer: Garver 

  • Improvements at the FEB site, including construction of new structures such as the Headworks, Influent Pump Station, and Electrical Building, along with upgrades to the existing Screening Chamber.
  • Installation of large-diameter influent and yard piping, valves, fittings, and below-grade utilities 
  • Installation of new force main infrastructure to support upgraded plant flows, including new large-diameter piping and system tie-ins.
  • Demolition of existing structures at the Paris WWTP including the Administration Building, Trickling Filter, and Concrete Paving 
  • Rehabilitation of existing ATAD, Chemical Disinfection, Chlorination/De-Chlorination Basin
  • Construction of new plant facilities, including Sludge Holding tanks and Blowers, Solids Dewatering Feed Pump Station, Solids Dewatering and Offloading Building Expansion, Septage Receiving Station, and the Administration and Operations Building

Reliable Results. Proven Performance.

Drake Companies delivers projects that perform as promised. Our work reflects disciplined planning, experienced crews, and a commitment to meeting specifications, budgets, and schedules.

With in-house capabilities spanning general contracting, paving, logistics, and material supply, we maintain control over critical phases to ensure consistent quality from start to finish.

Serving Public and Private Sectors

Our portfolio includes infrastructure and facility projects across Texas and neighboring states. We support a range of clients and industries.

Built on Experience and Integrity

Drake Companies’ integrated structure allows us to anticipate challenges, maintain clear communication, and deliver dependable results for every client.

Drake Companies

Building the groundwork for infrastructure across the US.

Service Areas

Company

  • About Us
  • Safety
  • Projects
  • Locations
  • Careers
  • Contact Us

Industries

  • Water/Wastewater
  • Healthcare
  • Worship
  • Manufacturing
  • Education
  • Commercial

Contact

  • 1540 NW Loop 286, Paris, TX 75460
  • (903) 784-4321

©2026 Drake Companies. All Rights Reserved.

Website by GroupM7™